Test Equipment Solutions Ltd - Used Test Equipment Sales and Rental
Product Search

Quality Standards

Here at Test Equipment Solutions we have embedded quality in everything we do. From the time of your first call to us, to the receipt of your equipment and beyond, we have setup our operations to ensure the quality of our products AND service are second to none.

Our engineers have years of test equipment experience to provide you with the best advice and we keep a comprehensive library to ensure we have the data we need to back it up.

Our systems are uniquely setup to operate a test equipment business so we can manage our deals as efficiently and effectively as possible, without mistakes. At each step of the process, checks are made and signed off. All our processes are comprehensively documented to ensure consistent quality in all aspects of our business.

Our Lab features a comprehensive set of test equipment, calibrated to national standards and able to generate and measure to 26.5GHz. Every single product we supply is electrically tested and mechanically & cosmetically refurbished. Each product is checked for EMC, Y2K and safety conformance and undergoes a final quality check by the Sales Engineer you deal with to ensure you get the quality both you and he expect. We issue a Certificate of Conformance with every product we supply which is your assurance that the equipment operates to manufacturers specification.

Our 17 point 'Delta Test' process:
 

Phase 1: Interior Refurbishment

Quality 1
  • Instrument covers are removed.
  • Interior is cleaned to remove dust etc.
  • All fans and ventilation holes/filters checked and cleaned. Replacement filters are fitted as appropriate.
  • All interior sub-assemblies, cables and connectors etc. are examined for damage or wear and replaced/repaired as appropriate.
  • The security of sub-assemblies and circuit boards is verified and corrected as appropriate. This includes re-seating boards and cleaning edge connectors where necessary.
  • CRT performance is checked to ensure longevity.
 

Phase 2: Exterior Refurbishment

Quality 2
  • All non-instrument labels are removed.
  • All switches, connectors, keys, buttons etc. are checked. Faulty or damaged items are replaced as a matter of course.
  • Bezels, panels, handles and other hardware are checked. Faulty or damaged items are replaced as a matter of course.
  • Instrument panels/covers are thoroughly cleaned.
 

Phase 3: Performance Verification

Quality 3
  • Equipment is PAT tested to ensure that it is electrically safe
  • Equipment that is not already CE marked is checked for compliance.
  • Instrument software/firmware versions are checked and, where possible, updated to the newest appropriate level.
  • Equipment is tested using to ensure that it meets the original manufacturer specification. This testing includes all accessories that are being supplied.
  • Equipment is 'soak tested' for a minimum of 1 hour.
 

Phase 4: Quality Assurance

Quality 4
  • Integrity seals are fitted.
  • Final Sales Engineer QA approval.




 

We'll Call You
Enter your contact details &
we'll call you back - FREE!
Free Business Tool
Business Tools
Keep Updated
Register to receive special offers and price updates.
 
 
Quick Quote


Please enter your details and test equipment requirement below.
We will send you pricing and availabilty by return.
Name
Phone
Email
Company
Requirement

Test Equipment Solutions Ltd. Unit 8 Elder Way, Waterside Drive, Langley, Berkshire, UK. SL3 6EP
Telephone +44 (0)1753 59 6000 - Facsimile +44 (0)1753 59 6001 - Email info@TestEquipmentHQ.com
Registered in England No. 3708609 VAT No. GB720616268 © Copyright Test Equipment Solutions Ltd.